WhatsApp)
Aug 24, 2011· This is a very old first generation shoulder ballast cleaner built by Loram. It was imported into Australia by Loram in 2000. It was part of a rail rectification contract held by Loram with the ...

laboratory and in-situ test methods have been used. A review of available testing methods is presented herein in the context of railroad subgrade assessment. Discussion on the applicability of each test to the American railroad industry is also included. In-situ tests likely provide the greater advantage in railway engineering because results can

outward and downward during the test with the percentage of fines in the cleaned shoulder ballast either remaining close to the condition after ballast shoulder cleaning or was slightly increasing. This study demonstrates shoulder ballast cleaning improves track performance through increased drainage and support throughout the track structure.

Lateral Resistance of Railway Track Jabbar Ali Zakeri ... In Mechanical track displacement Test method, additional equipments are attached to the tamping machine, in which the track lining and lifting cylinders provide the lateral and ... to increase the track lateral stiffness is increasing the width of the ballast shoulder and the

Jan 31, 2010· I intend to use cork under the track and want to chamfer the edge to give the correct profile. However, Im not sure how wide the shoulder should be. Does it depend on location, era, use of line, railway company, etc. ? Thanks in advance for all answers. Stu

A specialized ballast cleaning machine that cleans shoulder ballast. Such cleaning operations are usually carried out in between two overhaul cycles and are targeted at shoulders with heavy fouling and poor drainage, to reduce damage to the track bed and extend the overhaul cycle.

The Flipscreen screening bucket is used by many railways to de-foul ballast by scooping fouled ballast off the shoulder and screening it over the toe line into perfectly sized recovered ballast that can be put straight back onto the shoulder.

Shoulder Ballast Cleaner Work Method Statement This document is uncontrolled when printed Version Number: 1.0 Date Reviewed: 13 May 2016 Page 1 of 14 Shoulder Ballast Cleaner – Specific to SBC34 Warning You cannot undertake this activity in the rail corridor unless you have completed a pre work brief and work site protection plan.

The central features are powerful scraper chains that excavate the fouled ballast and at the same time prepare the foundation for the new ballast. The ballast is cleaned in large oscillating screens with several screening levels which ensures optimum quality. The clean ballast is returned to the track directly behind the excavating chain.

adequate lateral track stability with smaller ballast shoulder widths than those specified in Table 4.1. [8] The resistance to buckling forces may be enhanced by the provision of a ballast shoulder surcharge (windrow). [9] Use of the guidelines in this Clause will provide a design ballast shoulder .

Table 6-8. Recommended Ballast Gradations. Amounts Finer Than Each Sieve (Square Opening) Nominal Size. Percent by Weight. Square Opening. ... Figures 6-1 through 6-7 show standard ballast shoulder widths and side slopes. In. finished or resurfaced track, the top of ballast may be up to 1 in. below the top of the tie, but never above. the top ...

SPECIAL ISSUE PAPER 113 Contribution of base, crib, and shoulder ballast to the lateral sliding resistance of railway track: a geotechnical perspective

The ballast should be renewed from time to time, because due to continuous hammering the ballast converted into the powder form. This powder along with dust, sand ashes from locomotive form an impervious layer and prevent the ease flow of water through ballast. Ballast maximum size is 1.9 to 5.0 cm with some reasonable proportion of intermediate sizes.

shoulder cleaning process was highly effective in removing fines and restoring desirable shoulder ballast support and drainage properties. Further periodic analysis also supports that the fines in the center of the track and along the shoulders tend to move outward and downward during the test with the percentage of fines in the cleaned ...

The shoulder ploughs draw the ballast into the upper area of the ballast bed towards the ballast crown. There the crown plough takes the ballast and distributes it in the track area according to the position of the baffle plates. Following this, a sweeper unit clears the ballast stones from the sleeper surfaces.

Shoulder Ballast Cleaning Guidelines 6 How does Shoulder Ballast Cleaning work? • It removes fouled ballast or mud "plugs" at the ends of sleepers that hold water in the ballast profile. • Mudholes form in wet, fouled ballast where there are impacts on the rail surface or weak spots in the underlying formation.

Rail ballast typically sits on a layer of roadbase type material, ... is most important, since this ballast shoulder is, for the most part, the only thing restraining lateral movement of the track. ... In the case of ballast the test is used to calculate volumes required as material is mostly delivered to a project by rail .

SPECIAL SPECIFICATION 4391 Ballasted Track Construction 1. Description. This Item shall govern for the construction of ballasted track on constructed trackbed. Ballasted track construction includes, but is not limited to, placing ballast, distributing and lining ties, installing and field welding running rail, raising and lining track,

Ballast cleaning removes this worn ballast, screens it and replaces the "dirty" worn ballast with fresh ballast. The advantage of ballast cleaning is that it can be done by an on-track machine without removing the rail and sleepers, and it is therefore cheaper than a total excavation. In the 19th century and early 20th century, ballast was ...

It is essential for ballast to be piled as high as the ties, and for a substantial "shoulder" to be placed at their ends; the latter being especially important, since this ballast shoulder is the main restraint of lateral movement of the track. The ballast shoulder always should be at least 150 mm (6 inches) wide, and may be as wide as 450 mm ...

Le Pen and Powrie (2011) present the opinion of the European Rail Research Institute (ERRI) that sleeper crib and base ballast contribute approximately 1/3 each to the lateral resistance of the sleeper on unloaded track. In this case, a ballast shoulder with typical dimensions should provide about 1/3 of the lateral resistance.

particularly in shoulder and maintain ballast profile after machine working. (x) Lifting of track shall be resorted after ensuring adequate availability of ballast for maintaining ballast profile for planned lifting. (xi) Adequate arrangements for supply and training out of ballast prior to deep screening .

Shoulder, or ballast cleaners are complicated looking machines that perform a basic but very important task, keeping ballast free from debris and dirt so it can most efficiently drain water away from the track structure (ties and rails).

Specifications for Industrial Tracks 2 2.0 Development of Industrial Projects 2.1 Process for Industrial Track Projects The development of an Industrial Project requiring rail service by CN can be broken into